img_2505(1)

Home PageCo-location ServicesData Centre LocationsSuntech @ Penang Cybercity

Suntech @ Penang Cybercity

Download the complete specifications here.

Specifications
Location1-12B-17 & 18, SUNTECH @ Penang Cybercity
Lintang Mayang Pasir 3, 11950 Bayan Baru.
Penang, Malaysia.
Building InformationSingle block 21-storey commercial building
(Parking space are available from Level 1 to Level 9)
Power Supplies11kV HT Power Feed from TNB Power Grid
Telecommunication
Manhole
Manhole for the incoming telecommunication fibre path
Building Floor Information
Floor Height4.45 meter, slab to slab
Floor Load2.5 k-N per square meter
Total Data Centre Area1,000 square feet
Construction / Partitions
CeilingNo false ceilings for Data Centre Areas
Partitions2 hours fire rated partition for each Fire Suppression zone
Cabling SystemThe data centre is installed with structured cabling system & infrastructure
Raised Floor System
Raised Floor Area per Floor1,000 square feet
RAF Height300mm Raised Floor Height
RAF TypeHPL Cementatious Rigid Grid System
Concentrated Load4.5 kN
Uniform Load12 K-N per Square Meter
Underfloor InsulationThermal Isolation Trocellin Polyethlene Foam
Perforated Panel Perforated Panels are placed at the Cold Aisle
Data Centre Specifications
Critical Load Power Density60 watts per square feet
Cooling Density60 watts per square feet
Cabinet Dimension42RU 600mm (width) x 1000mm (depth)
Rack ArrangementHot Aisle and Cold Aisle Configuration
Hot aisle spacing: 1,200mm
Cold aisle spacing: 1,000mm
Critical Load Power DistributionOne (1) Primary and One (1) redundant final sub-circuits from Separate PDU within the data centre
Lighting500lux light density at the Raised Floor
UPS System
UPS SystemTransformerless True-Online Double Conversion Modular Type Static UPS
UPS Capacity20kVA per module
Total Capacity60kVA
UPS Battery Autonomy 10 minutes at full load
UPS RedundancyN + 1 Configuration
UPS External BypassProvided
Power Distribution Unit
(PDU)

PDU ConfigurationEach PDU received one 400Vac protected Power Supply from UPS output panel within the data centre area.

PDU is equipped with Digital Power Meter, KWH Meter and Indicating Lights

PDU Capacity2 x 70kVA
Circuit per CabinetOne (1) Primary and One (1) Redundant final Circuit from separate PDU.
Circuit ProtectionEach final circuit is individually protected by MCB and RCCB at PDU.
Circuit Breaker SizesSingle Phase 20A, 30A single Phase are available from the PDU
AC Voltage at the cabinet level 230V/ 50 Hz
400V/50 Hz
Emergency Power Generator (EPG)
EPG Plant120KVA Backup Diesel Generators
Fuel TankExternal fuel tanks able to support EPG plant for 24 hours at Full load
Supported ServicesData Centre UPS, CRACs, Chillers, Lighting
and General Services within Data Centre Areas
Environmental Management System (EMS)
SystemAn integrated Environmental Management System (EMS) is installed to monitor and control all facilities within AIMS’ data centre
MonitoringEMS system shall perform the following monitoring functions

-Automatic Control and Monitoring of the environmental control system.
-Monitoring of UPS and backup Generator Systems
-Monitoring of Fans, CRAC units - Monitoring of Fire Safety System
-Monitoring of Water Detection
Monitoring of Room Temperature and RH
Earthing System
“Dirty” EarthBoth “Dirty” and “Clean” Earths will be available at the data centre area.

The dirty (electrical) earth system is linked to existing building electrical earth.

All the electrical earth / bonding are connected to the Main Dirty Earth Bar including the raised floor system pedestals bonding
“Clean” Earth“Clean” earth point is provided to each rack location under the raised floor
ACMV System
Air Con SystemOwn Flow Precision Air Cooled CRAC (Computer Room Air Conditioning) units are installed
CRAC RedundancyN+1 redundancy
CRAC System SupportChiller System is supported by the EPG Plant
Temperature Control22 Degree +/- 2º
Humidity Control50 RH +/- 10 RH
Water Leakage Detection
Water Leakage DetectionWater Leak Detection system is installed in data centre area
Leak Detection TypeResistive leak tape (cable) monitoring leakage at any point along the perimeter of the data centre area and surrounding the CRACs
Fire Protection System
Fire SuppressionData Centre Areas are installed with FM-200 fire suppression system
FM2000FM-200 Gas Suppression System will be installed above and under the raised access floor in data centre areas
Fire Alarm and Detection SystemTwo stages of alarms are implemented for RM-200 heat and smoke detection system
Security Access SystemContactless Card Access System for all Data Centre door entrance and exit
Emergency Break glassEmergency Break Glass is installed at each door exit
Surveillance Camera System
CCTV SystemDigital Surveillance System and Cameras are deployed at all of the AIMS data centre premises
Data Centre AreaCCTV Cameras are installed at the entrance and corridors within the data centre areas. Every row of racks is monitored by the CCTV
Control and MonitoringVideos are captured by the Digital Multiplexer located at data centre
Recording / Backup Videos are captured in the Digital Multiplexer / Recorder’s hard disk and backed up to an external tape or DVD Media with 90 days storage period